50 Chimica Oggi - Chemistry Today - vol. 35(6) November/December 2017 Design of batch versus continuous processes 1. Single-purpose equipment* 2. Multi-purpose equipment* 3. Extended analysis of cost parameters* SUMMARY The “Design of Batch Versus Continuous Process” Trilogy by Goršek and Glavi č : Starting in 1997, Gorsek and Glavic introduced a series of three papers: (1) Part 1: Single-Purpose Equipment; (2) Part 2: Multi-purpose Equipment; (3) Part 3: Extended Analysis of Cost Parameters. This series does an excellent job of comparing batch and continuous processes. The authors are not promoting a specific viewpoint and do an excellent job of framing what a practitioner should consider when building a chemical plant. Part 1 of the series compares production of a single product in a batch plant and in a continuous plant. The manuscript enumerates when continuous and batch are best deployed: • Plants with large volumes (5000t/yr) continuous; smaller plants (<500t/yr) are batch. • Batch reactors are used when a set of equipment is used to produce multiple products. • Plants producing seasonal and short lifetimes are usually batch. • Batch reactors are favored for slow reactions. • Batch reactors are favored for materials that foul equipment because the equipment naturally ceases operation and can be cleaned during the downtime. • Batch reactors are favored for smaller volumes when slurries are starting materials or products. Gorsek and Glavic proceed to examine each of these assumptions in context of single-purpose equipment (Part 1) and multi-purpose equipment (Part 2) and then provide a more detailed analysis of the cost parameters of each (Part 3). The authors indicate that their series is the first comparison of batch and continuous chemical manufacturing from a general perspective and the first to examine the role of energy consumption and recycling. The authors encourage the plant designer to find the best fit of equipment and desired outcome with respect to product quality and cost. The authors offer the following factors as being critical when considering mode of operation: • Production rate/capacity • Market forces • Operational problems • Energy integration • Overall economic analysis • Comparison of different routes Part 1 of this series compares a single-product batch and continuous system theoretically using production capacity, recycle structure, and energy integration metrics. An example problem is then used to fuel their discussion and conclusion. The example problem includes a complex process that was simulated using tools of the day. A number of interesting conclusions are reached from their analysis: • Batch equipment costs were higher than continuous for all capacities examined. • Fixed costs (manpower, maintenance, etc..) were higher for batch • Continuous systems are advantageous when recycling and energy integration are considered. Gorsek and Glavic examine in Part 2 how their analysis changes when multi-purpose production is considered. The authors found that in this case batch processes were more profitable at capacities lower than 1300 t/yr. The authors define a rubric for considering batch vs. continuous for multi-purpose facilities: (1) design a continuous process; (2) replace each continuous process unit operation by a batch unit; (3) merge similar batch units; (4) compare the total costs of the merged units with the costs of comparable batch and continuous units including recycles and energy integration; (5) determine the best process using net-present-worth (NPW) estimates of steps 1-4. The teamends their series with a detailed examination of the cost parameters associatedwith batch and continuous manufacturing plants. This examination supports their early conclusions that continuous provides better overall economics for single-product facilities for all scales and that for multi-purpose facilities the scale is important. For smaller scales, batch is favored but as the scale increases the choice becomes more nuanced. Chi ica ggi - Che istry Today - vol. 36(1) January/February 2018 Figure 1. Goršek and Glavi č ’s series indicates that continuous systems for dedicated single products yield higher net present worth over all volumes. Alternatively, when considering multiproduct plants batch and continuous approaches have very similar net present worth when small to medium volumes are considered. Continuous systems do not show advantage until volumes greater than ~1400 t/yr as shown in the graph. THE FLOW CHEMISTRY JOURNEY - ECONOMICS $
Made with FlippingBook
RkJQdWJsaXNoZXIy MTY5Njg=