• Validated analytical methods and data on recovery studies • Acceptable criteria, including rationale Some additional items that should be included are system boundaries, fit-foruse confirmation, planned hold times, sampling plan, sample storage, number of runs and rationale, and automated Clean-in-Place (CIP) acceptance criteria. Even though some of the information may be obtained at a later date from electronic or paper records, it is important that the approving departments have the information easily available prior to approving the protocol(s) and initiating validation. Furthermore, worst-case locations must be heavily securitized; and sampling instructions are clear and easy to follow. For example, when swabbing multiple surfaces with one swab (e.g., between equipment surface or gasket) should be clearly stated. Execution Protocol execution is always a stressful activity. In low-risk manufacturing, missed steps or missing information can lead to protocol deviation or additional CV runs or worse, a site deviation. In contrast, improper swabbing technique; wrong swab location; or wrong visual inspection can lead to a serious cross contamination situation – patient safety or death. Therefore, accurately executing, documenting, and verifying is critical. It is best practice to review the execution documentation on a frequent basis, so any missed activities or deviations from the protocol can be quickly addressed and possibly remediated. Training on the protocol and sampling is crucial. Only will proper training prevent or reduce the number of protocol deviations, it will decrease future site deviations (e.g., buildup due to improper swabbing) and increase confidence in the CV data. Protocol deviations Any significant changes (5) or variation from the protocol (6) should be documented (i.e., protocol deviation) and justified. Any pre-defined acceptance criteria not met should be recorded in a protocol deviation (5). After a thorough investigation, the root cause and required remediation will determine if the failed trial can be omitted (i.e., add additional run) or if the validation needs be completely restarted. Deviations should follow a Corrective Action and Preventive Action (CAPA) System process (7). (8) is an excellent resource for investigating and applying risk management tools to deviations. Final report As with protocols, final reports have some essential contents. The final report should include: • Summary of test results (9), (5), (10), (1), (11) • Clear statement that the validation status (3), (9), (5), (10), (1(, (11),(4) • Discussion of deviation(s) or changes and verification of closure (9), (10), (1), (12), • Define PM (RM) plan (1), (12) Additionally, (12) recommends including list of products, equipment, validated parameters and ranges, references to cleaning procedures in the report. It is good practice to also include the validated hold times in the final report, so there is documented agreement among stakeholders. Although there are safety margins in cleaning limits, it is best case that the CV results are on the lower end of the cleaning limit (nondetectable to 20% of the cleaning limit). This is not always possible due to low HPAPI limits. If the CV results are on the edge of failure, a discussion should be included which provides confidence that the risk of cross contamination is low. This discussion could discuss the reproducibility of the cleaning or level of safety margin (distance between cleaning limit and safety limit). (12) states “An important consideration should be an assessment of the final level of risk from the hazards and controls as demonstrated during the qualification runs. Future changes to the equipment or product introductions will require ongoing analytical assessment, especially for low HBEL products.” STAGE 3 After validation is completed and the equipment is being used commercially; the cleaning process must perform as validated, Product Changeover (PC) must be monitored, and any changes to the process or cleaning must be evaluated. 23 Chimica Oggi - Chemistry Today vol. 41(2) 2023
RkJQdWJsaXNoZXIy MTY5Njg=